VR
  • 产品详情

Impulse dust collector

Pulse dust collector adopts a cleaning method using pulse spraying. The interior contains multiple cylindrical high-temperature resistance filter bags, and the box is made by strict welding process. The inspection doors are sealed with plastic rubber, so it can ensure that the whole machine is tight and does not leak air. It has advantages of high efficiency, large processing air volume, long filter bag life, small maintenance workload, safe and reliable operation, etc. It is widely used in dust removal and purification of non-fibrous dust in various industrial and mining enterprises like metallurgical, construction, machinery, chemical, and mining etc. This product is mainly composed of a box body, air filter bags, ash hopper, gas pipe, pulse valves, a fan and a controller.

 

Working principle:

Dust-containing gas enters the interior of the dust collector from the air inlet. Due to the rapid expansion of the gas volume, some of the coarse dust particles fall into the ash bucket due to inertia or natural settlement, most of the remaining dust particles enter the bag chamber with the airflow. After filtering through the filter bag, the dust particles are retained on the outside of the filter bag. When the dust on the surface of the filter bag continues to increase, causing the equipment resistance to rise to the set value, the time relay (or differential pressure controller) outputs a signal and the program controller starts to work. The pulse valves are opened one by one, so that the compressed air is sprayed through the nozzle, so that the filter bag suddenly expands. Under the action of reverse airflow, the dust attached to the surface of the filter bag quickly leaves the filter bag and falls into the ash hopper (Or ash bin), the dust is discharged by the ash discharge valve, the purified gas enters the upper box from the inside of the filter bag, and then is discharged into the atmosphere through the valve plate hole and the air outlet, so as to achieve the purpose of dust removal.

It is another dust removal equipment in the drying line. Its internal multi-group filter bag structure and pulse jet design can effectively filter and collect dust in the dust-laden air, so that the dust content of the exhaust air is less than 50mg/m³, ensuring that it meets the environmental protection requirements. According to the needs, we have dozens of models such as DMC32, DMC64, DMC112 for selection.





Schematic diagram of the matching use of pulse dust collector and cyclone dust collector


Customer Feedback



Transport Delivery


CORINMAC has professional logistics and transportation partners who have cooperated for more than 10 years, providing door-to-door equipment delivery services.








Transport To Customer Site




Installation And Commissioning


CORINMAC provides on-site installation and commissioning services. We can send professional engineers to your site according to your requirements and train on-site personnel to operate the equipment. We can also provide video installation guidance services.



Installation Steps Guidance Drawing




Company Production Ability




Certificates





Faqs
  • We have never been engaged in mortar production, don't have experience, and do not understand mortar production lines. Can you provide technical and process guidance?
    Yes, we have rich experience in mortar production process and production line technology, and we will customize the production plant according to your needs and provide a full range of project guidance. We can design the Production Line Layout and Site Planning according to the size of your work shop, and provide technical support for mortar formulas.
  • Are you a Factory, a Design company, or a Trading company?
    We are a factory with our own mechanical design engineers and project design engineers, and have a production workshop of 10,000 square meters. 
    We can provide customized solution design according to customer needs, and full-process services such as early project communication, scheme design, equipment selection, equipment production, site planning, equipment layout, transportation and delivery, installation and commissioning.
  • Can I visit your factory?
    Welcome to visit our factory, we can provide you the invitation letter required for visa application. We will meet you at the airport or station and provide professional business reception services.
  • What is the positioning and cost performance of your products?
    We have professional engineers, skilled production workers, high-standardd quality inspection process, and sales and after-sales service teams with barrier-free communication. We can assemble and test all the equipment and pack them carefully before delivery. Maybe our prices is not the lowest, but we are definitely your most suitable and trustworthy partner.
  • What certificates and certifications do you have?
    We have ISO9001 quality management system certification. And we can also provide relevant certification according to the requirements of the customer's country, such as: SGS, EAC certification, etc.
  • Can you produce customized equipment according to our requirements?
    We can produce customized products according to customer needs. The users of the equipment are more aware of the problems in the use of the equipment, so we humbly accept the customer's suggestions and improve the equipment.
  • How long is the delivery time and shipping time?
    According to the production task, the general equipment production period is about 20-30 working days. After the equipment production is completed, you can come to our factory in person, send someone to our factory, or ask we to provide photos and videos of the finished product for inspection.
    The transportation methods include railway, sea, sea-rail combined transportation, etc. The transport time of different countries is different: Southeast Asia: 7-15 days, Central Asia: 20-30 days, Middle East: 20-40 days, Africa & America countries: 30-50 days, Russia and European countries: 25-40 days. We will provide photos and videos of equipment loading throughout the delivery process, as well as official customs clearance information.
  • How long is warranty period, how to guarantee after-sales service, and how to solve equipment quality problems?
    The warranty period of our equipment is 12 months, but it usually takes about 30 days (1 month) to transport from China to the customer's site, and installation and commissioning time also takes about 30 days (1 month). Therefore, our warranty period for foreign customers is extended to 18 months from the date of delivery (except for wearing parts). We will provide customers with necessary wearing parts when delivering the goods. If it is necessary to replace the parts, we will send the parts to the customer's site by air, and all cost will be borne by us.
  • Can engineers be sent to our site for installation and training?
    We can send experienced engineers to the customer's site to guide equipment installation, debug the production line until it is put into production, we will also provide installation instructions, layout drawings, assembly drawings, etc. If the customer has his own engineer, he can install the equipment according to the installation steps drawings we provide, and we can also guide the installtion with online videos.
Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Recommended

Send your inquiry

LEAVE US A MESSAGE

Just leave your email or phone number on the contact form so we can serve you.

Attachment:

    Send your inquiry

    Attachment:
      Choose a different language
      English
      Tiếng Việt
      العربية
      Español
      français
      Português
      русский
      简体中文
      Current language:English