NEWS
VR

30-35 tons per hour sand drying production line was delivered to Novosibirsk, Russia.

May 07, 2024

On April 19, 2024, CORINMAC one set of drying equipment was delivered to Novosibirsk, Russia.

 

This is the second time the customer has ordered our sand drying production line. 

 

The capacity of the first set was 15-20 tons per hour, which can not meet the customer's production needs. This time we provide customers with a dryer with cylinder diameter of 2.9 meters and cylinder length of 5.8 meters. The capacity can reach 30-35 tons per hour. 

 

Because of the cold winter in Novosibirsk, we have added insulation layers to the dryer cylinder and pulse dust collector according to the local climate conditions to ensure that the dryer does not lose heat, and the pulse dust collector does not condense water and block the filter bags.

Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Send your inquiry

Attachment:
    Choose a different language
    English
    Tiếng Việt
    العربية
    Español
    français
    Português
    русский
    简体中文
    Current language:English