8-10tph drying production line put into production
June 01, 2018
A drying production line with a capacity of 8-10tph has been put into production
The dry sand drying line has been put into production after 10 days of installation and commissioning at the customer's factory.
The dry sand drying production line with an output of 8-10 tons per hour includes raw material silo, feeder, belt conveyor, three-cylinder dryer, cyclone and so on.